Replacement of 250 MVA Shunt Reactors, S/S FSL, Jeddah Replacement of 3 x 250 MVAR Shunt Reactors, 380 kV S/S FSL & HVP S/S, Jeddah Installation of Electrical Equipment, PP10 S/S, Riyadh Complete Network Change, Upgrading from 11 kV to 13.8 kV for the Ministry of Defense, Taif Emergency Assistance for 132 kV Cable Repair, Riyadh
Replacement of 3 x 250 MVAR shunt reactors for 380 kV S/S FSL & HVP S/S. Jeddah Installation of electrical equipment for PP10 S/S. Riyadh Replacement of 132 kV U/G cable with 138 transition joints. Jeddah
Replacement of underground 230 kV cables. Jubail Plant Emergency assistance of 132 kV cable repair. Riyadh Consultancy and professional services for a power plant. MARAFIQ
Conducted HVAC testing for 400 kV cable circuits with a length of 23 km per phase and a capacitance of 0.25 µF/km, including high voltage injection for partial discharge (PD) measurement in collaboration with MITSUBISHI/PRYSMIAN (2010).
400 kV GIS testing for Areva/Alstom. Qatar, UAE, and KSA (2010/2011) Achievement – longest 400 kV HV cable AC testing. Worldwide
We specialize in designing, engineering, installing, and maintaining high-voltage electrical systems. Our expertise spans power transformers, GIS, and HV equipment up to 380 kV. We offer comprehensive services including testing, commissioning, maintenance, and troubleshooting.
Specialized in high-voltage and low-voltage cable pulling, with skilled crews trained for all environments, from trenches to deep tunnels.
Expertise in handling various cable types, ensuring efficient installation while minimizing damage.